Minor works items - 1.17
- Jump to
- Item details
- Submission procedure
Item details
Item no. | 1.17 |
---|---|
Item class/type | Class I TypeAB |
Nature of works | Repair |
Scope of works | The works involve any structural elements or any concrete projection from the structural elements |
Result in any additional load to any cantilevered slab | No |
In accordance with the original design | Yes |
If the works involve the removal of core from any structural elements or concrete projection | The removal works is for testing and ascertaining the condition of the concrete only |
Other requirement | Not involve Minor Works item 2.17 |
More details: See Item 1.17 Description of building works, Schedule 1 - Part 3 - Division 1, Building (Minor Works) Regulation
Submission procedure
Step 1
Owner or their agent
Appoint Prescribed Building Professional and Prescribed Registered Contractor (Class I of Type A, B)
Step 2
Prescribed Building Professionals
Submit MW01 - Notice of Commencement, documents, photos 7 days before commencement of work
Step 3
Prescribed Building Professionals
Submit MW02 - Certificate of Completion, documents, photos within 14 days after completion of work