Minor works items - 1.45
- Jump to
- Item details
- Submission procedure
Item details
Item no. | 1.45 |
---|---|
Item class/type | Class I TypeA |
Nature of works | Erection/Alteration |
Location of the trellis | Located on a roof of a building |
Result in any additional load to any cantilevered slab | No |
The works involve the alteration of any other structural elements | No |
Height of the trellis | Not more than 2.5m |
The length and width of every opening of the overhead framework of the trellis | Not less than 200mm |
The horizontal clearance of the trellis from any other structure | Not less than 500mm |
For works carried out in a common part of the building and at the completion of the works |
|
For works carried out in a part that is not a common part of the building (non-common part) and at the completion of the works | The aggregate of the area covered by each trellis is:
|
Other requirement | Not involve Minor Works item 2.45 |
More details: See Item 1.45 Description of building works, Schedule 1 - Part 3 - Division 1, Building (Minor Works) Regulation
Submission procedure
Step 1
Owner or their agent
Appoint Prescribed Building Professional and Prescribed Registered Contractor (Class I of Type A)
Step 2
Prescribed Building Professionals
Submit MW01 - Notice of Commencement, documents, photos 7 days before commencement of work
Step 3
Prescribed Building Professionals
Submit MW02 - Certificate of Completion, documents, photos within 14 days after completion of work