Skip to Content

Building Information Modelling

Guidelines for using Building Information Modelling in Statutory Submissions

Appendix A Sample Drawings

Type of Plans Sample drawings generated from Software 1 Sample drawings generated from Software 2
Superstructure Superstructure - Revit Superstructure - Tekla
Foundation Foundation - Revit Foundation - Tekla
Demolition (including hoarding, covered walkway and gantry) Demolition - Revit Demolition - Tekla
Excavation & Lateral Support Excavation & Lateral Support - Revit Excavation & Lateral Support - Tekla
Site Formation Site Formation - Revit Site Formation - Civil 3D
Ground Investigation Ground Investigation - Revit Ground Investigation - Civil 3D
Drainage Drainage - Revit Drainage - ArchiCAD
Curtain wall Curtain wall - Revit Curtain wall - Tekla
Full set Sample Drawings full set Sample Drawings full set

Appendix B BIM Objects Presentation Summary

Appendix B BIM Objects Presentation Summary

Sample Models

Software 1

Sample Models - Software 1
Type of Plans Sample Models of Software 1
Superstructure, Foundation and Excavation & Lateral Support
Demolition (including hoarding, covered walkway and gantry)
Site Formation
Ground Investigation
Drainage
Curtain wall
Full set
Others *

*The "REVIT Sample-Architectural" and "REVIT Sample-Civil" models are the reference files to be linked in the above sample models of "Drainage", and "Superstructure" and "Demolition" respectively.

Software 2

Sample Models - Software 2
Type of Plans Sample Models of Software 2
Superstructure, Foundation, Demolition (including hoarding, covered walkway and gantry), Excavation & Lateral Support and Curtain wall
Site Formation
Ground Investigation
Drainage
Full set

Software Templates

Software 1

Type of Plans Software Template of Software 1
Superstructure, Foundation and Excavation & Lateral Support
Demolition (including hoarding, covered walkway and gantry)
Site Formation and Ground Investigation
Drainage
Curtain wall
Full set

Software 2

Type of Plans Software Template of Software 2
Superstructure, Foundation, Demolition (including hoarding, covered walkway and gantry), Excavation & Lateral Support and Curtain wall
Site Formation and Ground Investigation
Drainage
Full set

For more detailed step by step procedures of modelling, BIM users may make reference to the software-specific user guides published by the Construction Industry Council, available at https://www.bim.cic.hk/en/resources/publications

Top