Technical Committee on the Code of Practice for Dead and Imposed Loads
(Appointed by the Director of Buildings)
Enquiry:
G/F, Buildings Department Headquarters, North Tower, West Kowloon Government Offices, 11 Hoi Ting Road, Yau Ma Tei, Kowloon
Telephone:
2626 1616
(Handled by "1823")
(Handled by "1823")
Date of 1st Appointment | Date of Present Appointment | Term Expiry Date | |
---|---|---|---|
Chairperson | |||
Ir KO Mei-yee Chief Structural Engineer/New Territories, Buildings DepartmentMore details |
--- | --- | --- |
Members | |||
Ir LEUNG Siu-sum, Sam Senior Structural Engineer/301, Architectural Services DepartmentMore details |
1 Jan 2024 | 1 Jan 2024 | 31 Dec 2026 |
Ir LAM Yui-choi, Thomas Senior Structural Engineer/11, Housing DepartmentMore details |
22 Aug 2022 | 1 Jan 2024 | 31 Dec 2026 |
Non-official members | |||
Ir CHIN Sai-ping Representative from The Hong Kong Institute of EngineersMore details |
1 Jan 2024 | 1 Jan 2024 | 31 Dec 2026 |
Ir WONG Woon-ki Representative from The Hong Kong Institute of EngineersMore details |
1 Jan 2024 | 1 Jan 2024 | 31 Dec 2026 |
Dr LAW Kwan-ho Representative from The University of Hong KongMore details |
1 Jan 2024 | 1 Jan 2024 | 31 Dec 2026 |
Prof ZHAO Xiao-lin Representative from The Hong Kong Polytechnic UniversityMore details |
1 Jan 2024 | 1 Jan 2024 | 31 Dec 2026 |
Prof TSE Kam-tim Representative from The Hong Kong University of Science and TechnologyMore details |
22 Jan 2021 | 1 Jan 2024 | 31 Dec 2026 |
Prof XIAN Xiang-ping Representative from City University of Hong KongMore details |
1 Jan 2024 | 1 Jan 2024 | 31 Dec 2026 |
Secretary:
Senior Structural Engineer/Airport, Buildings Department
Telephone:
2626 1395
Terms of Reference
- To collect views and consider any comments or feedback received from the building industry arising from the use of the Code of Practice, relevant advancement in design, technologies and construction methods, and latest relevant overseas regulatory control and standards; and
- To advise and make recommendations to the Director of Buildings from time to time on the appropriate measures to be taken in response to Item 1 above.