Skip to Content

Boards and committees

Technical Committee on the Code of Practice for Precast Concrete Construction

Technical Committee on the Code of Practice for Precast Concrete Construction

(Appointed by the Director of Buildings)

Enquiry:
G/F, Buildings Department Headquarters, North Tower, West Kowloon Government Offices, 11 Hoi Ting Road, Yau Ma Tei, Kowloon
Telephone:
2626 1616
(Handled by "1823")
Boards and committees
Date of 1st Appointment Date of Present Appointment Term Expiry Date
Chairperson
Ir. TAM A-ray, Albert
Chief Structural Engineer/Kowloon and Rail, Buildings Department
--- --- ---
Members
Ir. CHAN Wah-chi, Eddie
Senior Structural Engineer /202,Architectural Services Department
22 Jan 2021 22 Jan 2021 31 Dec 2023
Ir. LAM Yiu Choi, Thomas
Senior Structural Engineer /11, Housing Department
22 Jan 2021 22 Jan 2021 31 Dec 2023
Non-official Members
Ir. FONG Pak-tong
Representative from The Hong Kong Institution of Engineers
22 Jan 2021 22 Jan 2021 31 Dec 2023
Ir. Prof LO Sai-huen, Daniel
Representative from The Hong Kong Institution of Engineers
22 Jan 2021 22 Jan 2021 31 Dec 2023
Mr LEE Shiu-ming
Representative from The Hong Kong Construction Association
22 Mar 2012 22 Jan 2021 31 Dec 2023
Ir. Dr YEUNG Sai-kit
Representative from The Hong Kong Concrete Institute
4 Dec 2017 22 Jan 2021 31 Dec 2023
Mr CHAN Ching-leung
Representative from Hong Kong General Building Contractors Association
22 Jan 2021 22 Jan 2021 31 Dec 2023
Prof. PAN Wei
Representative from The University of Hong Kong
4 Dec 2017 22 Jan 2021 31 Dec 2023
Prof. POON chi-sun, JP
Representative from The Hong Kong Polytechnic University
4 Dec 2017 22 Jan 2021 31 Dec 2023
Prof. CHAN Yui-bun, Ben
Representative from The Hong Kong University of Science and Technology
22 Jan 2021 22 Jan 2021 31 Dec 2023
Dr. LAU Tak-bun, Denvid
Representative from City University of Hong Kong
22 Jan 2021 22 Jan 2021 31 Dec 2023
Secretary:
Senior Structural Engineer/Hong Kong 1, Buildings Department
Telephone:
2626 1698
Terms of Reference

  1. To collect views and consider any comments or feedback received from the building industry arising from the use of the Code of Practice, relevant advancement in design, technologies and construction methods, and latest relevant overseas regulatory control and standards; and
  2. To advise and make recommendations to the Director of Buildings from time to time on the appropriate measures to be taken in response to item 1 above.
Top