Date of 1st Appointment Date of Present Appointment Term Expiry Date
Chairperson
Ir. TANG Lap-win, Calvin
Chief Structural Engineer/Kowloon and Rail, Buildings Department
--- --- ---
Members
Ir. LUNG Wun Hong, Ken
Senior Structural Engineer /202,Architectural Services Department
12 Feb 2025 12 Feb 2025 31 Dec 2026
Ir. LAM Yiu Choi, Thomas
Senior Structural Engineer /11, Housing Department
23 Dec 2022 26 Jan 2024 31 Dec 2026
Non-official Members
Ir. LEUNG Chi-hung, Ben
Representative from The Hong Kong Institution of Engineers
26 Jan 2024 26 Jan 2024 31 Dec 2026
Ir. LI Wai-yip, Joseph
Representative from The Hong Kong Institution of Engineers
26 Jan 2024 26 Jan 2024 31 Dec 2026
Ir. CHAN Kwok-chung
Representative from The Hong Kong Construction Association
26 Jan 2024 26 Jan 2024 31 Dec 2026
Ir. Dr. YEUNG Sai-kit, Jaime
Representative from The Hong Kong Concrete Institute
4 Dec 2017 26 Jan 2024 31 Dec 2026
Mr. LAI Hei-keung, Peter
Representative from Hong Kong Registered Contractors Association
26 Jan 2024 26 Jan 2024 31 Dec 2026
Dr. YU Jing
Representative from The University of Hong Kong
26 Jan 2024 26 Jan 2024 31 Dec 2026
Ir. Prof. POON chi-sun, JP
Representative from The Hong Kong Polytechnic University
4 Dec 2017 26 Jan 2024 31 Dec 2026
Prof. CHAN Yui-bun, Ben
Representative from The Hong Kong University of Science and Technology
22 Jan 2021 26 Jan 2024 31 Dec 2026
Dr. LAU Tak-bun, Denvid
Representative from City University of Hong Kong
22 Jan 2021 26 Jan 2024 31 Dec 2026
Secretary:
Senior Structural Engineer/Hong Kong 1, Buildings Department
Telephone:
2626 1698
Terms of Reference

  1. To collect views and consider any comments or feedback received from the building industry arising from the use of the Code of Practice, relevant advancement in design, technologies and construction methods, and latest relevant overseas regulatory control and standards; and
  2. To advise and make recommendations to the Director of Buildings from time to time on the appropriate measures to be taken in response to item 1 above.
Top