Minor works items - 1.15
- Jump to
- Item details
- Submission procedure
Item details
Item no. | 1.15 |
---|---|
Item class/type | Class I TypeA |
Nature of works | Erection/Alteration/Repair/Removal |
Result in any additional load to any cantilevered slab | No |
The works involve the alteration of any other structural elements | No |
Type of external wall for erection or alteration | External non-load bearing reinforced concrete wall, but not including concrete projection from the wall |
Type of external wall for repair or removal | External non-load bearing reinforced concrete wall, including any concrete projection from the wall |
The height of the wall | More than 1.1 m but not more than 3.5m |
Other requirement | Not involve Minor Works item 2.15, 3.45 or 3.46 |
More details: See Item 1.15 Description of building works, Schedule 1 - Part 3 - Division 1, Building (Minor Works) Regulation
Submission procedure
Step 1
Owner or their agent
Appoint Prescribed Building Professional and Prescribed Registered Contractor (Class I of Type A)
Step 2
Prescribed Building Professionals
Submit MW01 - Notice of Commencement, documents, photos 7 days before commencement of work
Step 3
Prescribed Building Professionals
Submit MW02 - Certificate of Completion, documents, photos within 14 days after completion of work