Contractors can only undertake the relevant classes or items of minor works for which they have been registered.
Drying racks
Erection/Alteration/Removal
3.29
Erection/Alteration/Removal
- Projecting from an external wall
≤ 750mm
- Distance between the rack and the ground or the roof
> 3m
3.30
Removal
- Projecting from an external wall
Strengthening of any unauthorised drying rack
3.36
Strengthening of any unauthorised drying rack
- Projecting from an external wall
≤ 750mm
- If the distance from the ground
≤ 3m, no part of the rack projects over any street/common part of the building