Contractors can only undertake the relevant classes or items of minor works for which they have been registered.
Spread footings
Construction/Alteration
Class I
Construction/Alteration
- Involve excavation depth
≤ 3m - Overall gradient of area bounded by lines 10m away from the location of the footing in the downhill direction
≤ 15°