Skip to Content

Minor Works Items

Spread footings

Contractors can only undertake the relevant classes or items of minor works for which they have been registered.

Spread footings

Construction/Alteration
Class I

1.11

Minor Works Items 1.11

Construction/Alteration

  1. Involve excavation depth
    ≤ 3m
  2. Overall gradient of area bounded by lines 10m away from the location of the footing in the downhill direction
    ≤ 15°
Class II

2.10

Minor Works Items 2.10

Construction/Alteration

  1. Involve excavation depth
    ≤ 1.5m
  2. Overall gradient of area bounded by lines 10m away from the location of the footing in the downhill direction
    ≤ 5°
Top