Skip to Content

Forms

Mandatory Building Inspection Scheme

Mandatory Building Inspection Scheme

Download Adobe® Acrobat® Reader to read the publications in PDF format.
Download Adobe Acrobat Reader

Specified Forms

Use these specified forms to submit notification and certificate to Building Authority for record and audit check. For details, please refer to Procedures and Specified Forms of MBIS.

Form
Form No. Description Online submission
MBI2 Notification of Nomination of Another Registered Inspector (RI) to Temporarily Supervise the Prescribed Repair
03/2019 | Sample
Yes
MBI3 Certificate of Building Inspection (Applicable where Prescribed Repair is Required after Inspection)
12/2020 | Sample
Yes
MBI3a Certificate of Building Inspection (Applicable where NO Prescribed Repair is Required after Inspection)
12/2020 | Sample
Yes
MBI4 Certificate of Building Repair
12/2020 | Sample
Yes
MBI5 Certificate of No Business Connection (Applicable where the RI Appointed for the Prescribed Inspection did NOT Supervise the Prescribed Repair Completed)
03/2019 | Sample
Yes

Use these mobile forms to upload the draft, retrieve and complete the form within 24 hours.

Quick Guides for e-Forms.

Specified Forms

Use these specified forms to submit notification and certificate to Building Authority for record and audit check. For details, please refer to Procedures and Specified Forms of MBIS.

Form
Form No. Description Online submission
MBI1 Notification of Appointment of Registered Inspector (RI) for Prescribed Inspection and / or Supervision of Prescribed Repair of Building Yes
MBI2 Notification of Nomination of Another Registered Inspector (RI) to Temporarily Supervise the Prescribed Repair Yes
MBI3 Certificate of Building Inspection (Applicable where Prescribed Repair is Required after Inspection) Yes
MBI3a Certificate of Building Inspection (Applicable where NO Prescribed Repair is Required after Inspection) Yes
MBI4 Certificate of Building Repair Yes
MBI5 Certificate of No Business Connection (Applicable where the RI Appointed for the Prescribed Inspection did NOT Supervise the Prescribed Repair Completed) Yes
If irregularity is noted in the submitted specified form, this department will return the form without processing further. Please refer to .

Common Irregularities Found in the Submitted Specified Forms (Form MBI 1, MBI 2, MBI 3, MBI 3a, MBI 4 and MBI 5)

  1. Address of building/premises does not match with the statutory notice number.
  2. Owner's/Owner representative's/Registered Inspector's name missing/signature outstanding.
  3. Incomplete/incorrect registration number of Registered Inspector.
  4. Signature of Registered Inspector different from this Department's records.
  5. Incorrect date of certification or declaration in MBI Form. (e.g. date of certification or declaration should be made on or after the date of inspection/completion.)
  6. Inspection/completion report not enclosed in submitted Form MBI 3, MBI 3a or MBI 4.
Top